A Compute Host

GPU / CPU server

▶  See it in 3D   The CXL Fabric region

GPU box
8× GPU + HBM
Memory
fixed & stranded
Borrows via
CXL switch
Pays for
more HBM + pooling
In plain English

One server doing the actual work — a GPU box or a CPU box. The catch: the memory inside it is bolted in and can't be shared, so one machine starves while its neighbour wastes hundreds of idle gigabytes. CXL is the plumbing that lets the starving one borrow. Every box that runs short of memory is, ultimately, a customer for everything else on this map.

What it is

A host is one server doing the work — either a GPU box (8 accelerators, fast but memory-starved) or a CPU box (lots of slow DRAM). The problem: each one's memory is locked inside its own chassis. A GPU server can run out of HBM mid-job while the CPU box next to it has hundreds of idle gigabytes — stranded and unreachable.

The business

Every memory-starved host is a customer for this whole atlas. It buys more HBM (SK Hynix/Micron) when it can, and reaches through a CXL switch (Astera) to borrow from a shared pool when it can't. The demand signal that pulls the entire supply chain starts here — at the box that needs more memory than it owns.

Bottleneck severity

High

Who makes it

NVIDIANVDA

GPUs, NVLink, NVSwitch, photonic switches · USA (fab TSMC)

Buys the most HBM, NVLink and optics on earth and pre-buys supply to lock rivals out: ~60% of CoWoS, $2B each into Coherent and Lumentum (Mar 2026), $2B into Marvell. B300 (288 GB HBM3E) is the shipping reference GPU; Rubin (288 GB HBM4, 22 TB/s) samples Q4 2026, volume Q1 2027.

Rubin ramp timingsupply lockupsNVLink Fusion breadth
↗ Investor relations & news

AMDAMD

MI GPUs, EPYC CPUs, UALink · USA (fab TSMC)

MI-series GPUs with leading HBM capacity; the anchor of UALink. Zen 6 EPYC "Venice" launched July 2026 with roughly a year before Intel answers; MI400 carries the first UALink production silicon (H2 2026).

MI400 rampVenice share gainUALink silicon
↗ Investor relations & news

Astera LabsALAB

Retimers, CXL controllers, fabric switches · USA (fab TSMC)

The only large-cap pure-play on AI connectivity — Aries retimers, Leo CXL controllers, Scorpio fabric switches. Q2 2026 revenue $392M (+104% YoY) as Scorpio X entered volume; Q3 guided $540–560M. Building NVLink Fusion hybrid racks for 2027. Risk: one customer is most of revenue.

Scorpio X volumeQ3 guide $540–560Mcustomer concentration
↗ Investor relations & news

SK Hynix000660.KS

HBM3E / HBM4 stacks · South Korea

#1 HBM maker (~62% share). Qualified HBM4 at NVIDIA first and holds an estimated 60–70% of Rubin's HBM4 allocation, with a TSMC-made logic base die. Sold out through 2027; its CEO calls 2027 potentially the tightest supply year the industry has seen. The bellwether of the whole cycle.

Rubin HBM4 shareHBM4E / 16-Hi samplesM15X + Yongin ramp
↗ Investor relations & news

MicronMU

HBM3E / HBM4, DDR5, CXL modules · USA (fab Japan/Taiwan)

#3 HBM, the only US-HQ DRAM maker. Qualified on Rubin HBM4; sold out through 2027 and meeting only ~50–65% of what customers ask for. New Idaho capacity doesn't land until 2027–28 — so the squeeze is structural, not seasonal.

HBM bit-sharefill rate vs requestsHBM gross margin
↗ Investor relations & news

Metrics that move this layer

Where it comes from

USAGPU/CPU silicon — NVIDIA, AMD
—deployed in every hyperscaler rack

Connected to

The Interconnect WarCXL Memory ModuleHBM3E / HBM4The Memory Wall

Further reading

Astera Labs — beating the memory wall on Azure ↗Introl — CXL memory pooling guide ↗